Representative Projects

Diverse Range of Projects

Karen Frye brings more than 35 years of experience managing and reviewing nearly 200 environmental documents for infrastructure and development projects nationwide, including 19 years overseeing environmental review at the San Francisco Public Utilities Commission.

The following projects represent a selection of her experience in consulting and public agency leadership.

Tesla Ultra Violet Treatment Facility Groundbreaking, with Governor Gavin Newsom

Tesla Ultra Violet Treatment Facility Groundbreaking, with then-Mayor Gavin Newsom, 2009

Water Infrastructure Projects

  • Harry Tracy Water Treatment Plant Long-Term Improvements Project EIR

    San Francisco Public Utilities Commission (SFPUC)

  • New Crystal Springs Bypass Tunnel EIR

    San Francisco Public Utilities Commission (SFPUC)

  • San Joaquin Regional Water Quality Improvement Project EIR including UV Disinfection at Tesla Treatment Facility

    San Francisco Public Utilities Commission (SFPUC)

  • Long Term Contract Renewals EA for Sacramento Canals Unit and Feather Water District

    US Bureau of Reclamation

  • Resource Management Plan and Environmental Assessment at East Park Reservoir

    US Bureau of Reclamation

Coastal Projects

  • Ocean Beach Climate Change Adaptation Project EIR and Federal Environmental Requirements

    San Francisco Public Utilities Commission (SFPUC)

    Environmental Project Director/Manager

    Managed environmental review for a multi-agency coastal adaptation project addressing shoreline erosion, sea level rise, infrastructure protection, and public access. Coordinated with federal, state, and local agencies on complex regulatory and environmental issues. The EIR received a 2026 AEP Merit Award for Outstanding Environmental Analysis.

  • East Cliff Drive Bluff Protection and Parkway EIS/EIR

    Santa Cruz County & US Army Corps of Engineers

  • Programmatic EIS for Long-Term Navy Dredged Material Disposal, San Diego

    US Navy

  • MCI/Worldcom Fiber Optic Cable EIR/EIS, Santa Cruz and Monterey Counties, California

    MCI Worldcom

  • U.S. Coast Guard Station Humboldt Bay Boathouse Modification Environmental Assessment

    Coast Guard

Wastewater Infrastructure Projects

  • Southeast Plant Biosolids Digester Facilities Project EIR and CEQA Plus

    San Francisco Public Utilities Commission (SFPUC)

    Environmental Project Manager

    Managed preparation of the EIR for new solids treatment, odor control, energy recovery, and associated facilities. Also managed the environmental requirements for the State Revolving Fund Loan process including an MOA with the State Historic Preservation Officer. EIR won award for outstanding environmental document from AEP. Prepared two EIR addenda for a Biogas Utilization System and for Operations, Engineering and Maintenance Buildings.

  • Environmental Justice Analysis for Bayview-Hunters Point, Biosolids Digester Facilities Project and Community Benefits Program

    San Francisco Public Utilities Commission (SFPUC)

    Co-Project Manager

    Managed report, with extensive community input, which presents existing conditions related to a broad selection of environmental justice indicators, and analysis of potential adverse or beneficial effects of the Project and the San Francisco Public Utilities Commission (SFPUC)'s Community Benefits Program. The analysis received an AEP Merit Award for Environmental Analysis.

  • North Shore to Channel Force Main Project Mitigated Negative Declaration (MND)

    San Francisco Public Utilities Commission (SFPUC)

  • Palo Alto Regional Water Quality Control Plant UV Disinfection Project IS/MND

    City of Palo Alto

Third-Party Reviews

  • Final EIS for the BART to SF Airport Extension

    Federal Transit Administration

  • Level 3 Fiber Optic Network Programmatic Environmental Assessment

    California Public Utilities Commission

  • Global West Fiber Optic Cable EIR

    State Lands Commission and Global Photon Systems

  • Programmatic EIS/EIR for the CALFED Bay-Delta Program Technical Reports Review

    CALFED

    Team Coordinator

    Reviewed 26 technical reports for use in the Programmatic EIS/EIR. Team provided comments on organization, consistency, level of detail, overall findings presented by topic area, and recommendations for resolving issues within each area.

US Navy Projects

  • Programmatic EIS for San Francisco Bay Area Candidate Base Closure/Realignment

    US Navy

  • Disposal and Reuse EIS/EIR (Base Closure) for Treasure Island, Mare Island Naval Shipyard and Naval Supply Center Oakland

    US Navy and City of San Francisco, City of Vallejo and City of Oakland

  • EIS for the Realignment of E-2 Squadrons from MCAS Miramar

    US Navy

  • EIS for Transformation of the 2nd Brigade, 25th Infantry Division (Light) to a Stryker Brigade Combat Team in Hawaii

    U.S. Army Corps of Engineers (USACE) and US Navy

Habitat Restoration Projects

  • Bioregional Habitat Restoration Project

    San Francisco Public Utilities Commission (SFPUC)

    Environmental Construction Compliance Manager

    The Project combines impacts of several different construction projects into one suite of habitat improvement projects that maximizes significant, ecosystem-level improvements to habitat for rare and endangered species. Oversaw construction compliance with environmental specifications, environmental permits, and the Mitigation, Monitoring and Reporting Program.

  • Polhemus Creek Restoration Project

    San Francisco Public Utilities Commission (SFPUC)

Recycled Water Projects

  • City of Palo Alto Reclaimed Water Pipeline Project EA

    Bureau of Reclamation

  • Lancaster Division Street Corridor Recycled Water Project IS/MND

    City of Lancaster

  • Antioch Recycled Water Master Plan IS/MND

    City of Antioch

  • Recycled Water Project IS/MND

    Delta Diablo Sanitation District and City of Pittsburg

Energy Infrastructure Projects

  • PG&E Power Asset Acquisition Project EIR

    San Francisco Public Utilities Commission (SFPUC)

  • Hetch Hetchy Water and Power Transmission Lines 7/8 Upgrade Project Addendum to MND

    San Francisco Public Utilities Commission (SFPUC)

  • San Francisco Public Utilities Commission (SFPUC) Reliable Power Project MND

    San Francisco Public Utilities Commission (SFPUC)

Floodplain and Groundwater Projects

  • North Gila River Flood Protection Project EA

    US Bureau of Reclamation

  • Pajaro River Watershed Study Soap Lake Floodplain Preservation Project IS/ND

    Pajaro Valley Water Management Agency

  • Revised Basin Management Plan Project EIS

    Pajaro Valley Water Management Agency

  • Upper Llagas Creek Flood Control Project Supplemental EIS/EIR and Biological Assessment

    U.S. Army Corps of Engineers (USACE) and the Santa Clara Valley Water District